CLSC

Florida service area

Steel buildings in Fort Myers, Florida

CLSC is a Florida steel builder serving Southwest Florida and the Gulf Coast. Every building we install in Fort Myers is wind rated to 155 mph and tested at our FEMA-approved wind-tunnel facility — engineering that matters in a hurricane state. Posted package prices include taxes, delivery, and installation on your existing pad.

What we build here

Real builds, real prices

Priced, delivered, installed.

Every package includes delivery and installation east of the Mississippi on your existing concrete pad. Custom doors, windows, trim, and interior build-out quoted separately.

20 × 35 Cold-Form Starter steel building

$14,900

GarageWorkshop

20 × 35 Cold-Form Starter

20 × 35 × 9

Cold-formed steel beam building with 2:12 pitch roof. Includes doors, delivery, and installation on your existing concrete pad.

18 × 24 Backyard Bardo steel building

$15,000

BardoShe Shed

18 × 24 Backyard Bardo

18 × 24 + 6' porch

Durable, fire-resistant steel bardo with a 6-foot front porch. Shell package including taxes, delivery, and installation — under 10 weeks.

26 × 26 RV Mancave steel building

$16,900

RVMan Cave

26 × 26 RV Mancave

26 × 26 + 24' lean-to

Storage area with a 24-foot lean-to — ideal for RVs, motorcycles, tractors, and a stocked refrigerator. Taxes, delivery, and install included.

Prices as posted; delivered and installed east of the Mississippi on your existing concrete pad. Custom doors, windows, trim, and interior build-out quoted separately.

Questions, answered

Do you deliver and install in Fort Myers?

Yes — Fort Myers is inside our core Florida service area. Posted prices include taxes, delivery, and installation on your existing concrete pad.

Are CLSC buildings hurricane rated for Fort Myers?

Our buildings are wind rated up to 155 mph (category 5) and tested at our own FEMA-approved wind-tunnel facility.

How long does installation take?

Most CLSC buildings are installed in under 10 weeks from contract, weather permitting. Larger commercial builds are scheduled case by case.